This page was exported from IT Certification Exam Braindumps [ http://blog.braindumpsit.com ] Export date:Sat Apr 5 23:54:38 2025 / +0000 GMT ___________________________________________________ Title: Latest [May 25, 2022] NACE-CIP2-001 Exam with Accurate Coating Inspector Level 2 PDF Questions [Q20-Q41] --------------------------------------------------- Latest [May 25, 2022] NACE-CIP2-001 Exam with Accurate Coating Inspector Level 2 PDF Questions Take a Leap Forward in Your Career by Earning NACE 100 Questions Q20. You are the NACE Level 2 inspector reviewing the documentation from a NACE Level 1 you notice significant documentation errors.Your FIRST preferred course of action is to:  Correct the errors yourself and suggest the Level 1 inspector be replaced  Correct the errors yourself and advise your supervisor that the Level 1 Inspector is incompetent  Have the Level 1 Inspector correct the errors and set up remedial training to improve the quality of documentation  Correct the errors yourself and submit the reports without any further action Q21. You are the new NACE Level 2 Inspector on a job which had been very problematic. The previous Inspector was fired duo to personality conflicts with the Contractor’s supervisor. Upon arriving onsite the Contractor’s supervisor advises you in no uncertain terms that you will be the next to go, unless you cooperate with him.Your FIRST preferred course of action is to:  Challenge the supervisor’s authority  Defend the previous inspector  Express a willingness to work with the site team and follow the specification  Suggest to the Owner that the supervisor should be removed from site Q22. Linings are used on the interior of pipelines to  provide protection against soil chemicals.  afford limited temperature insulation.  protect the transported product.  reduce magnetic polarity. Q23. Cold-applied tape  are identifiable by its distinct colors, usually light blue, green, Or Grey.  is typically green or led and looks like “painted” finish.  have a cross-linked polyethylene backing and a heat-activated adhesive.  is polyethylene film, heat laminated, ‘With an adhesive layer of butyl glue. Q24. A failure caused by applying a coating too thinly is known as  failure to cure.  chalking.  cracking.  pinholes. Q25. You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.As this is not part of the standard you should:  Ignore the additional requirement  Enforce the additional requirement  Call your supervisor  Request clarification from the specifier Q26. The cost of qualified Coating Inspection is normally offset by:  Lower Application Costs  Lower Coating Life Cycle Costs  Lower Safety Enforcement Costs  Lower Supervision Costs Q27. All of these are advantages of using repair patches EXCEPT  special tools or equipment are required.  excellent abrasion resistance.  inert to common acids, alkalis, and solvents.  barrier to moisture and corrosion. Q28. An Inspection and Test Plan is required when:  It is always required  When the Coating Applicator requests one  When the Owner specifies one  When the Inspector requests one Q29. A single component water borne acrylic coating cures by:  Solvent Evaporation  Coalescence  Co-Reaction  Oxidation Q30. Inspectors perform tests on linings that they may not perform on exterior coatings because  coatings are more durable than linings.  coatings are expected to degrade over time.  linings protect the contents and the container.  linings are more durable than coatings. Q31. NACE/SSPC Water Jetting standards are directly equivalent to ISO Abrasive Blast Standards:  True  False Q32. When performing an adhesion test in accordance with ASTM D 3359 where the Dry Film Thickness is approximately 10 mils, the Inspector should use:  Method A – X Cut  Method A – Cross Hatch  Method B – X cut  Method B – Cross Hatch Q33. In powder coatings, when the particles of powder begin to flow but are not fully liquid, they are in what stage?  Flow stage  Wetting stage  Cure stage  Gel stage Q34. As a NACE Level 2 Inspector, NACE clearly indicates that you ate qualified to independently produce final documentation for a shop project.  True  False Q35. In the event of a conflict between the Product Data Sheet and the Specification:  The Product Data Sheet prevails  The Specification prevails  It is up to the Inspector to decide which one to follow  It is up to the Applicator to decide which one to follow Q36. When NACE/SSPC WJ 1 is referenced; what type of equipment would the Inspector expect to see on the job:  Power Tools  Abrasive Blasting Equipment  Water Jetting Equipment  Scarifiers Q37. The solvent sensitivity/solvent wipe test (ASTM D4752) is used to determine the cure of  urethanes.  inorganic zincs.  epoxies.  powder coatings. Q38. Antifouling coatings are regulated by international treaties.  True  False Q39. External coatings applied to buried pipelines are generally tested for:  Gloss level  Chalking resistance  Cathodic disbondment  Solvent resistance Q40. In which type of concrete are laitance commonly encountered?  Concrete block (poured with a form)  Gunite  Glass fiber cement  Poured (wet cast) Q41. On pipelines, which coating is identifiable by its distinct colors, usually light blue, green, or grey?  Liquid epoxies  Heat-shrink sleeves  Concrete  Coal Tar Enamel  Loading … Authentic Best resources for NACE-CIP2-001 Online Practice Exam: https://www.braindumpsit.com/NACE-CIP2-001_real-exam.html --------------------------------------------------- Images: https://blog.braindumpsit.com/wp-content/plugins/watu/loading.gif https://blog.braindumpsit.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2022-05-25 09:26:11 Post date GMT: 2022-05-25 09:26:11 Post modified date: 2022-05-25 09:26:11 Post modified date GMT: 2022-05-25 09:26:11