This page was exported from IT Certification Exam Braindumps [ http://blog.braindumpsit.com ] Export date:Sun Oct 6 14:20:43 2024 / +0000 GMT ___________________________________________________ Title: [Q55-Q79] Tested Material Used To C_TS413_2020 Test Engine Exam Questions in here [Jul-2022] --------------------------------------------------- Tested Material Used To C_TS413_2020 Test Engine Exam Questions in here [Jul-2022] Penetration testers simulate C_TS413_2020 exam PDF QUESTION 55The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct Answers to this question.  Open reservations can be cleared when a maintenance order operation is finally confirmed.  For the combination of order type and planner group, you can decide when reservations are created.  All open reservations are closed when the maintenance order is set to TECO.  Reservations are created only after a material availability check has been performed. QUESTION 56What is the basic procurement process in an SAPsystem?  Purchase requisition, purchase order, goods receipt, invoice receipt  Goods receipt, purchase order, invoice receipt, vendor master  Sales order, production order, purchase order  Inquiry, sales order, purchase order, delivery QUESTION 57Whichof the following BOMs will you use to setup spare parts planning of functional locations and equipment?  Construction BOM  Maintenance BOM  Production BOM  Costing BOM QUESTION 58Which activities can the plannner perform by using the maintenance planning overivew with the default filters? choose 3 answers  analyze outsanding notifiaction that have NOT been assigned to the maintenance order  analyze released maintenance orders whose end date is in the past and were NOT finally confirmed  display purchase orders for non-stock material for which the goods receipt was NOT posted  analyze confirmed maintenance orders which were NOT setteled  display approved purchase requisitions for non-stock material for which NO purchase order was generated QUESTION 59You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time – key date. The orders should be called 3 months before the planned date. How can you set up the maintenance plan? Note: There are 2 correct Answers to this question.  Set the offset to 3 months.  Set the call horizon to 75%.  Set the call horizon to 90 days.  Set the call horizon to 25%. QUESTION 60You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note:There are 2 correct Answers to this question.  Start counter reading  Estimated annual performance  Scheduling period  Counter overflow reading QUESTION 61Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct Answers to this question.  Maintenance plan item  Maintenance plan header  Measurement document  Work order confirmation  Equipment task list QUESTION 62How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct Answers to this question.  Via cost center and activity type  Via business partner and hourly price  Via activity type and hourly rate  Via organizational unit and personal hourly rate QUESTION 63Which of the following statements about orders with operation account assignment (OAA) are correct?Note: There are 3 correct Answers to this question.  Purchase requisitions have the operation as account assignment.  A technical object must be assigned to an order operation.  Costs are stored only for the operation object.  Overall costs are dynamically summed up on the header level.  The settlement rule is maintained on the header level. QUESTION 64Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct Answers to this question.  ESRI maps  Technical objects  Breakdown analytics  Work orders and operations  Cost analytics QUESTION 65What are the effects when the planner release a maintenance order? choose 3 answers  the planner can estimate costs  the planner CANNOT change planned costs  the planner can print the job papers  the technician can record confirmations  the warehouse clerk can post a goods issue QUESTION 66The planner must add an activity to a notification which must be executed in the future. Which option in the notification, that can be predefined in a catalog does the planner use? choose 1 answer  an activity in the notification item  a task in the notification header  a text in the notification item  a text in the subject long text screen QUESTION 67You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?  Maintenance plan category  Scheduling indicator  Maintenance package offset  Shift factor QUESTION 68You create an equipement task list for piece of equipment without BOM assignment. How can you assign component to a task list operation of this equipement taks list? choose 1 answer  – assign the header material ofa material BOM as assembly to a task operation– select components from the BOM to the task list operation  – assign the BOM usage for free material assignement in customizing– freely assign material as componenet to the task list operation  – manually assign the BOM usage to a task list header– add component from the BOM to the task list operation  – assign the header material of a mateiral BOM to the equipment taks list header– select compoment from the BOM to the task list operation QUESTION 69The planner callls the document flow in the work order, which of the following document type are directly displayed? choose 3 answers  material document  accounting document  time confirmation  controlling document  invoice QUESTION 70Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct Answers to this question.  Cancel dispatched maintenance order operations.  Print job papers from a maintenance order.  Schedule and dispatch maintenance operations by shifts.  Monitor maintenance order operations due in the next 4 weeks. QUESTION 71Which options do you have to allow the assingment of order operation to object list entries. choose 3 answer  to all notification  to all maintenance plans  only to notifiaction created via maintenance plans  to all task list  to all object list entries QUESTION 72A maintenance planning plant…  Can only be assigned to one maintenance plant  Can be assigned to various maintenance plants  Is the organizational unit to which work centers are assigned  Is only relevant for cross-plant planning QUESTION 73Which statements about the structure indicator are correct? Note: There are 2 correct Answers to this question.  It defines the allowed characters for a functional location.  It can have a maximum length of 50 characters.  It defines hierarchy levels of the functional location structure.  It defines which data is transferred to the lower levels of the hierarchy. QUESTION 74Where can the planner check the material availbility? choose 3 answer  within the SAP fiori-based background job  from the list of orders  within an individual order  within the SAP fiori-based material document overview  from the reservation list QUESTION 75What happens when you enter an invoice with reference to a purchase order?  The system suggests data only from the purchase order.  The system suggests data only from the goods receipt.  The system suggests data from the purchase order and the goods receipt. QUESTION 76With SAP S/4HANA embedded analytics, which tools are aimed at end users?  Analytical SAPFiori applications  SAP Smart Business cockpits  Design Studio  Query Designer  Query Browser QUESTION 77The planner uses control key PM02 to purchase external service, what are the valid process steps? choose 3 answers  create the service entry sheet  accept the service entry sheet  create the purchase order  Book the goods receipt  Book the invoice QUESTION 78What does the structure indicator define? choose 2 answers  the field selection for the functional location list  the cateogry of the functional Icoation  the allowedcharacters for a functional location  the hierarchy levels of the functional location structure QUESTION 79A billing document can be createdfrom what two types of documents?  Sales order  Inquiry  Rebate list  Quotation  Delivery  Loading … Authentic Best resources for C_TS413_2020 Online Practice Exam: https://www.braindumpsit.com/C_TS413_2020_real-exam.html --------------------------------------------------- Images: https://blog.braindumpsit.com/wp-content/plugins/watu/loading.gif https://blog.braindumpsit.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2022-07-21 11:14:14 Post date GMT: 2022-07-21 11:14:14 Post modified date: 2022-07-21 11:14:14 Post modified date GMT: 2022-07-21 11:14:14