C_TS414_2021 Dumps are Available for Instant Access [2023]

Practice with these C_TS414_2021 dumps Certification Sample Questions

NO.40 Your consumer wants to perform an inspection at the vender’s site instead of performing one during goods receipt…..
Where must you change the settings in the system?

 
 
 
 

NO.41 Which of the following QM business processes can require a user’s digital signature?(3 Correct Ans)

 
 
 
 
 

NO.42 You define a priority type in the implementation guide (img) and assign it to a notification type. When you enter a priority during creation of notification, what can the system do?

 
 
 
 

NO.43 you can assign combination of material number and plants to one inspection plan Which organization structure must the plants share for correct cost collection in the inspection handlings ?

 
 
 
 

NO.44 Which object must combined in test scheduling in the stability study Correct 3

 
 
 
 
 

NO.45 The QM control key in the procurement data of the material master controls all but one of the following indicator(Which function does not control) ?

 
 
 
 

NO.46 When creating an operation step in an inspection plan , which of the following is mandatory?

 
 
 
 

NO.47 You can user business application programing interface (BAPIs) for different tests Which of the following statements describes a BAPI?

 
 
 
 

NO.48 Your consumer wants to receive quality certificates from its venders electronically. Where do you define the data and PDF transfer?

 
 
 
 

NO.49 Your customer uses MIC and requests automatic defect recording
After configuration defect recording the implementation Guide ,which additional steps must you perform to satisfy customer requirements?
(2 correct ans)

 
 
 
 

NO.50 Which inspection origin creates only unplanned physical samples?

 
 
 
 

NO.51 How many times can you execute the task step of an initial sample in a stability study?

 
 
 
 

NO.52 For which of the following QM elements can the short text be maintained in only one language

 
 
 
 

NO.53 During the production inspection, which elements does the system use to determine the layout of results and defects recordings? Note : 3 correct answer

 
 
 
 
 

NO.54 Your customer plan to use Test Equipment Management as part of QM.
What event triggers the creation of an inspection lot for calibration inspection?

 
 
 
 

NO.55 To use an inspection plan without multiple specification , you must assign a material master and plant. What additional data can you assign to an inspection plan?(2 correct Ans)

 
 
 
 
 

NO.56 For which structure elements of a quality notification can you assign a status profile? Note : 2 correct answer

 
 
 
 
 

NO.57 Your customer wants material -dependent code selected from a catalog to show when a Where can you control and limit the codes?

 
 
 
 

NO.58 Which business object must you use to create a stability study?

 
 
 
 

NO.59 How does the system handle equipment and functional locations in an inspection lot in calibration inspection?

 
 
 
 

Get Instant Access REAL C_TS414_2021 DUMP Pass Your Exam Easily: https://www.braindumpsit.com/C_TS414_2021_real-exam.html

         

Leave a comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below