BICSI RCDDv14 Exam Syllabus Topics:

Topic Details
Topic 1
  • Review ICT bids
  • tenders for completeness to the Request for Proposal (RFP) response and compliance to the design
Topic 2
  • Produce ICT Bill of Materials
  • List of Materials (BOM
  • LOM) for the project stakeholders
Topic 3
  • Participate in the procurement of ICT materials to ensure the materials match the submittals
  • Define scope of ICT Design
Topic 4
  • Participate in additional bid
  • tender activities (i.e., bidders’ conference, meetings, site walks) as required
Topic 5
  • Assess ICT current conditions as required to determine design solutions by conducting a site survey and reviewing record documentation
Topic 6
  • Design ICT telecommunication spaces to ensure standards compliance and
  • or client requirements are met
Topic 7
  • Produce ICT close-out documentation for the owner to provide the record documentation of the installation

 

Q151. In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providing

 
 
 
 

Q152. After meeting with the program sponsor and stakeholders, the program manager is asked by the sponsor to accelerate the program to replace two legacy financial systems. The legacy systems are at risk of premature failure.
What should the program manager do next?

 
 
 
 

Q153. An organization initiates an innovation program to deliver exceptional performance and benefits. After the program transition plan is in place and the implementation of a benefits sustainment plan starts the program manager discovers the program may be shut down due to lack of funding.
To ensure continued funding for the program, what should the program manager do next?

 
 
 
 

Q154. When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution design?

 
 
 
 

Q155. When responding to a submittal that has been rejected and/or has comments written by a reviewer, the ICT distribution designer may need to perform which two of the following actions? (Select two options.)

 
 
 
 
 

Q156. The program manager must define the program and understand the organization’s target market and customer needs. What should the program manager do first?

 
 
 
 

Q157. Program manager B leaves the program and program manager A takes over the program responsibilities Program manager A wants to ensure that all expected benefits of the program are realized.
What is used to assess the program cost/benefit justification?

 
 
 
 

Q158. Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?

 
 
 
 
 

Q159. Coupling with electrical circuits can create inductive interference to telecommunications facilities. Which of the following can decrease the coupling effect?

 
 
 
 

Q160. A program manager prepares the program for review to secure funding by senior management. Which of the following must the program manager identify when creating the program charter?

 
 
 
 

Q161. Status information, including program and component status, cost information, risk analysis and other relevant information, is provided in which of the following?

 
 
 
 

Q162. A program to implement a company’s new system is nearing completion and the program manager attempts to close the program However, despite training provided to the operational staff on the new system, there is concern that the defined expected benefits will not be fully realized.
To prevent this concern in the future, which of the following should occur?

 
 
 
 

Q163. The program manager of a multinational program must reconcile data including subject matter experts* labor hour estimates and other direct resource hour estimates. In addition the program manager must prepare the cash flow analysis Which of the following should be considered to get a baseline budget?

 
 
 
 

Q164. A component protect of a multiyear program delivers all expected products and services as anticipated. The component project manager obtains approvals from the stakeholders and transitions the benefits to operations What should the program manager do next?

 
 
 
 

Q165. A global enterprise resource planning (ERP) program’s scope includes designing and building a global template. Plans include a pilot implementation project to validate the template, to be followed by several rollout projects. During the build of the global template, a new government regulation mandates implementation of a goods and services tax (GST).
What should the program manager update?

 
 
 
 

Q166. An organization must accelerate a product to market. The program manager completes the preliminary program slaps and holds a kick-off meeting Project managers submit their preliminary schedules for review What should the program manager do next?

 
 
 
 

Q167. A program manager needs to establish direction and identity the essential aspects of a program. In addition, they must ensure that the context and framework of the program are properly defined assessed and documented Which document will be created to support this activity?

 
 
 
 

Q168. A company CEO meets with key customers to learn how they can be better served Alter discovering that some executive team members disagree with each other, the CEO asks the program management office (PWO) to develop a program to better serve key customers based on their strategic importance to the company’s long-term goals.
What should the program manager do to establish and successfully manage the program’s direction?

 
 
 
 

Q169. A new program manager joins a mufti-year program that has been underway for almost a year. During interviews, several stakeholders state that they do not understand how the program will help the organization At the next stakeholder meeting, what should the program manager present to address their concerns?

 
 
 
 

Q170. In which phase of the protect design would an ICT distribution designer be expected to prepare preliminary cost estimates?

 
 
 
 

Q171. In specifying labels and pruned tags that meet Underwriters Laboratories (UL) 969 Standard, marking and labeling systems are provided following the listed metrics. Which two of the following are REQUIRED for the UL standard? (Select two options.)

 
 
 
 
 

Q172. A component is scheduled to close at the end of the week. What should the program manager verity prior to allowing the component to close?

 
 
 
 

Q173. In a RFI, an ICT distribution designer instructs the contractor to test all the fibers In a PON Installation. Which of the following testing requirements does the designer include?

 
 
 
 

Q174. A company is evaluating the implementation of enterprise resource planning (ERP) software.
The program manager performs an analysis to confirm the program’s feasibility What other important step should the program manager complete^

 
 
 
 

Q175. A program manager has been assigned to a program that has received approval of the program charter and for which a stakeholder register has been prepared. During stakeholder engagement planning the program manager should consider which of the following stakeholder aspects?

 
 
 
 

Pass BICSI RCDDv14 Exam Quickly With BraindumpsIT: https://www.braindumpsit.com/RCDDv14_real-exam.html

         

Leave a comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below