QUESTION 55
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct Answers to this question.

 
 
 
 

QUESTION 56
What is the basic procurement process in an SAPsystem?

 
 
 
 

QUESTION 57
Whichof the following BOMs will you use to setup spare parts planning of functional locations and equipment?

 
 
 
 

QUESTION 58
Which activities can the plannner perform by using the maintenance planning overivew with the default filters? choose 3 answers

 
 
 
 
 

QUESTION 59
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time – key date. The orders should be called 3 months before the planned date. How can you set up the maintenance plan? Note: There are 2 correct Answers to this question.

 
 
 
 

QUESTION 60
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note:
There are 2 correct Answers to this question.

 
 
 
 

QUESTION 61
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct Answers to this question.

 
 
 
 
 

QUESTION 62
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct Answers to this question.

 
 
 
 

QUESTION 63
Which of the following statements about orders with operation account assignment (OAA) are correct?
Note: There are 3 correct Answers to this question.

 
 
 
 
 

QUESTION 64
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct Answers to this question.

 
 
 
 
 

QUESTION 65
What are the effects when the planner release a maintenance order? choose 3 answers

 
 
 
 
 

QUESTION 66
The planner must add an activity to a notification which must be executed in the future. Which option in the notification, that can be predefined in a catalog does the planner use? choose 1 answer

 
 
 
 

QUESTION 67
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

 
 
 
 

QUESTION 68
You create an equipement task list for piece of equipment without BOM assignment. How can you assign component to a task list operation of this equipement taks list? choose 1 answer

 
 
 
 

QUESTION 69
The planner callls the document flow in the work order, which of the following document type are directly displayed? choose 3 answers

 
 
 
 
 

QUESTION 70
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct Answers to this question.

 
 
 
 

QUESTION 71
Which options do you have to allow the assingment of order operation to object list entries. choose 3 answer

 
 
 
 
 

QUESTION 72
A maintenance planning plant…

 
 
 
 

QUESTION 73
Which statements about the structure indicator are correct? Note: There are 2 correct Answers to this question.

 
 
 
 

QUESTION 74
Where can the planner check the material availbility? choose 3 answer

 
 
 
 
 

QUESTION 75
What happens when you enter an invoice with reference to a purchase order?

 
 
 

QUESTION 76
With SAP S/4HANA embedded analytics, which tools are aimed at end users?

 
 
 
 
 

QUESTION 77
The planner uses control key PM02 to purchase external service, what are the valid process steps? choose 3 answers

 
 
 
 
 

QUESTION 78
What does the structure indicator define? choose 2 answers

 
 
 
 

QUESTION 79
A billing document can be createdfrom what two types of documents?

 
 
 
 
 

Authentic Best resources for C_TS413_2020 Online Practice Exam: https://www.braindumpsit.com/C_TS413_2020_real-exam.html

         

Leave a comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below