Q20. You are the NACE Level 2 inspector reviewing the documentation from a NACE Level 1 you notice significant documentation errors.
Your FIRST preferred course of action is to:

 
 
 
 

Q21. You are the new NACE Level 2 Inspector on a job which had been very problematic. The previous Inspector was fired duo to personality conflicts with the Contractor’s supervisor. Upon arriving onsite the Contractor’s supervisor advises you in no uncertain terms that you will be the next to go, unless you cooperate with him.
Your FIRST preferred course of action is to:

 
 
 
 

Q22. Linings are used on the interior of pipelines to

 
 
 
 

Q23. Cold-applied tape

 
 
 
 

Q24. A failure caused by applying a coating too thinly is known as

 
 
 
 

Q25. You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.
As this is not part of the standard you should:

 
 
 
 

Q26. The cost of qualified Coating Inspection is normally offset by:

 
 
 
 

Q27. All of these are advantages of using repair patches EXCEPT

 
 
 
 

Q28. An Inspection and Test Plan is required when:

 
 
 
 

Q29. A single component water borne acrylic coating cures by:

 
 
 
 

Q30. Inspectors perform tests on linings that they may not perform on exterior coatings because

 
 
 
 

Q31. NACE/SSPC Water Jetting standards are directly equivalent to ISO Abrasive Blast Standards:

 
 

Q32. When performing an adhesion test in accordance with ASTM D 3359 where the Dry Film Thickness is approximately 10 mils, the Inspector should use:

 
 
 
 

Q33. In powder coatings, when the particles of powder begin to flow but are not fully liquid, they are in what stage?

 
 
 
 

Q34. As a NACE Level 2 Inspector, NACE clearly indicates that you ate qualified to independently produce final documentation for a shop project.

 
 

Q35. In the event of a conflict between the Product Data Sheet and the Specification:

 
 
 
 

Q36. When NACE/SSPC WJ 1 is referenced; what type of equipment would the Inspector expect to see on the job:

 
 
 
 

Q37. The solvent sensitivity/solvent wipe test (ASTM D4752) is used to determine the cure of

 
 
 
 

Q38. Antifouling coatings are regulated by international treaties.

 
 

Q39. External coatings applied to buried pipelines are generally tested for:

 
 
 
 

Q40. In which type of concrete are laitance commonly encountered?

 
 
 
 

Q41. On pipelines, which coating is identifiable by its distinct colors, usually light blue, green, or grey?

 
 
 
 

Authentic Best resources for NACE-CIP2-001 Online Practice Exam: https://www.braindumpsit.com/NACE-CIP2-001_real-exam.html

         